Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Mar 05, 2021     Wiring, avionics - (1.8 hours)       Category: Electrical
1. Installed BNC connector on VOR/LOC antenna.
2. Once I had it done, I checked it with a continuity tester, as I always do. I was dismayed to find that there was a short somewhere between the back seat and the VOR cat's-whisker antenna at the top of the vertical stabilizer. I traced the defect to a segment that runs up the between the VS, so I cut out the bad segment and managed to fish through another section of RG-400 coax. I will crimp some new BNC connectors and hope for the best.

[Postscript: As it turned out, I didn't need to replace the coax. Doing a continuity check only works if the coax is not connected to the antenna base. But at least I upgraded the old RG-58 in the tail to RG-400. So not all was in vain.]


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.